夜夜躁狠狠躁日日躁-亚洲精品国产电影-日本高清www色视频-自拍偷在线精品自拍偷99

Hello! Welcome to Suzhou Anke Zhongda Purifying Technology Co.,ltd.! HOME | Add favorites | English | 中文版
PRODUCTS LISTS
CONTACT US
For more details, please consult
0512-68249823
0512-68240292-812
13951112621
CONTACT:Mr zhang
Or leave a message for us
NewsLOCATION:HOME >News
How to use air shower passage and precautions
 Hits:7781 AddTime:2021/3/11 17:21:18
How to use the air shower channel and precautions:
1. The air shower must be able to be used under the premise of good commissioning and operation, and the surrounding environment must be cleaned before use. It is better to use a vacuum cleaner to absorb the dust in the air shower channel area.
2. Turn on the power before use, and the red indicator light will be on. When the personnel enter the air shower room, close the door, and then the air shower fan will blow. When the time is set, the fan will stop automatically, and then the personnel can leave the air shower room and enter the production workshop.
3. In the air shower area, it is strictly forbidden to pile up sundries and bring in articles that are easy to cause dust and pollution.
4. When workers enter the air shower room, they should change their clothes, shoes and hats to reduce the dust content in the environment.
Air shower maintenance channel:
1. Air shower and medium efficiency air filter need to be replaced frequently due to the influence of environment. Medium efficiency air filter is the first filter used as high efficiency filter. Frequent replacement of medium efficiency air filter can reduce the load of high efficiency filter and prolong its service life, which is beneficial to improve air purification efficiency. When replacing, remove the front orifice plate, take out the filter material and replace it.
2. After a long time of efficient use, the dust accumulation increases, the resistance increases, and the wind speed decelerates (generally for one year), so it has to be replaced. When replacing, remove the medium efficiency air filter and loosen the nut of the high efficiency filter to remove the high efficiency filter.
3. Pay attention to the air flow direction when installing the high efficiency filter. The sponge side is the air outlet side. Pay attention to the flatness when installing the filter. The frame of the filter should be well sealed with the chassis, and no leakage is allowed.
4. When the fan breaks down, remove the medium efficiency filter to overhaul the fan.
5. The electrical part is equipped with electrical control panel or electrical control box. In case of failure, the wiring board can be overhauled by opening the manhole.
6. Shj-fl air shower is equipped with an access hole for other maintenance, and the access hole is set under the passage.
【Refresh】【Favorites】【Print】 【Close】
Previous:How to purchase a return air grille Next:The role of purifying air conditioning

主站蜘蛛池模板: 精品无码人妻一区二区三区不卡| 国产精品51麻豆cm传媒| 亚洲av无码乱码国产麻豆| 国产精品亚洲а∨无码播放| 国模肉肉超大尺度啪啪| 好吊色欧美一区二区三区视频| 特级欧美插插插插插bbbbb| 国产自愉自愉免费精品七区| 国产无遮挡又黄又爽又色| а√资源新版在线天堂| 久久精品a一国产成人免费网站| 久久国产亚洲精品无码| 久久精品国产亚洲av麻豆| 永久免费精品精品永久-夜色| 强行破瓜稚嫩粗暴顶弄哭喊| 国产精品igao视频网| 人人妻人人爽人人澡欧美一区| 娇妻被打开双腿灌满白浆一区| 国产性色强伦免费视频| 欧美人与物videos另类xxxxx| 欧美日本国产va高清cabal| 国产成人a∨麻豆精品| 欧美日韩午夜群交多人轮换| 精品国精品自拍自在线| 亚洲av成人一区二区三区av| 无码毛片一区二区三区本码视频 | 一区二区三区内射美女毛片| 色综合 图片区 小说区| 第一次处破女18分钟高清| 国产肉丝袜视频在线观看| 少妇把腿扒开让我舔18| 久久伊人精品一区二区三区| 一本一道久久综合狠狠老| 无码人妻精品一区二区蜜桃网站| 日本高清视频www| 日韩精品无码av中文无码版| 国产内射合集颜射| a级毛片100部免费观看| 欧美性狂猛xxxxxbbbbb| 综合无码一区二区三区| 深夜a级毛片免费视频|