夜夜躁狠狠躁日日躁-亚洲精品国产电影-日本高清www色视频-自拍偷在线精品自拍偷99

Hello! Welcome to Suzhou Anke Zhongda Purifying Technology Co.,ltd.! HOME | Add favorites | English | 中文版
PRODUCTS LISTS
CONTACT US
For more details, please consult
0512-68249823
0512-68240292-812
13951112621
CONTACT:Mr zhang
Or leave a message for us
NewsLOCATION:HOME >News
How to purchase a return air grille
 Hits:4801 AddTime:2023/6/15 17:39:52
The selection of sewage treatment equipment grids includes the selection of grid section, determination of grid spacing, and selection of grid slag removal methods. The cross-sectional shapes of grid bars include squares, circles, rectangles, and rectangles with semicircles. Circular cross-section bars have good hydraulic conditions, low water flow resistance, but poor stiffness, and generally use rectangular bars. The cross-sectional shape of the grid bars can be selected according to the following table.
Determination of grid bar spacing
1. The clearance of the front grille of the water pump is determined according to the requirements of the water pump. (Refer to P178 Table 6-3 of the teaching material)
2. The determination of the spacing between the front grille of the sewage treatment system is generally as follows: manual slag removal: 25-40mm; Mechanical slag removal: 10-25mm.
3. Determination of slag amount: For domestic sewage, if there is a lack of information, it can be determined according to Table 6-4 of the textbook.
Determination of Design Parameters for Grating of Sewage Treatment Equipment
1. The flow rate of sewage in front of the fence is 0.4-0.9m/s;
2. Flow velocity through the grid: 0.6-1.0m/s;
3. The height difference h1 (head loss) between the bottom of the channel before and after the gate is generally taken as 0.08-0.15m;
4. Grid inclination angle: 45 °~75 °
Operation and Maintenance
For manual slag removal grilles: promptly remove and prevent blockage.
For mechanical slag removal grilles: ensure normal operation. Intermittent cleaning should be equipped with overload automatic protection devices.
Regular inspection and maintenance of all parts of the equipment are required, and maintenance records should be kept.
【Refresh】【Favorites】【Print】 【Close】
Previous:Design Techniques for Lighting System Configuration in Purification Workshop Next:How to use air shower passage and precautions

主站蜘蛛池模板: 女女互磨互喷水高潮les呻吟| 特级aaaaaaaaa毛片免费视频| 无码av天天av天天爽| 久久久久夜夜夜综合国产| 97人人模人人爽人人少妇| 国产精品原创巨作av| 亚洲欧美日韩中文字幕在线一区| 亚洲小说图片| 亚洲乱码中文字幕综合| 免费女人高潮流视频在线观看| 午夜福利视频| 波多野结衣不打码视频| 无码乱码av天堂一区二区| 中文成人无字幕乱码精品区 | 少妇被躁爽到高潮无码人狍大战| 精品一区二区三区无码免费视频| 国产乱人伦偷精品视频下 | 久久精品午夜福利| 一本一道色欲综合网中文字幕| 国产精品一区二区在线观看 | 久久精品中文闷骚内射| 高清一区二区三区免费视频| 高中生自慰www网站| 手机在线观看av片| 精品麻豆国产色欲色欲色欲www| 亚洲av网站| 各种少妇wbb撒尿| 国产精品网站在线观看免费传媒| 疯狂做受xxxx国产| 人妻无码久久久久久久久久久| 夜夜爽夜夜叫夜夜高潮漏水 | 女人高潮抽搐喷液30分钟视频| 亚洲av无码一区二区三区性色| 无码人妻丰满熟妇啪啪7774| 我的丝袜美腿尤物麻麻| 国产成人精品久久一区二区三区 | 99re热这里只有精品视频| 国产在线精品一区二区中文| 无码人妻一区二区三区免费视频 | 日韩毛片免费无码无毒视频观看| 欧美丰满熟妇bbbbbb百度|